Showing one of 3 spans that made up the bridge, fabricated by A&M and painted by Sandtech in the winter of 2017, (inside a shop of course), finish showing is p346 polyurethane, for a longer lasting finish use t700.
River Philip Bridge – Structural Project
Structural Projects