Maintenance Project

This patching sequence is part of preparing the concrete in this St. John’s water tank ensures that even the smallest cracks get patched before installing the lining system of 215,217, and 22, drinking water coatings are very specialized and tested by Tnemec before full paint specifications are prepared, thank you coastal coatings for this fine job.

Skills

Posted on

May 13, 2019

Call Now ButtonCall